A 288 km high-voltage lifeline is under construction to strengthen electricity transmission between eastern and central Nepal. The project utilizes Nepal's first-ever domestically manufactured Litmus-supplied ACSR Moose conductor, enhancing efficiency and reliability.
ACSR MOOSE CONDUCTORS
Bhutan Power Corporation Limited (BPC) is the sole electricity provider in Bhutan, established in 2002 to ensure reliable and affordable power access throughout the country, contributing to its Gross National Happiness goal.
ACSR CONDUCTORS AND COPPER AND ALUMINUM POWER CABLES
The Dumre-Damauli 132 kV transmission line project aimed to strengthen Nepal's power grid by constructing a new 21 km line and upgrading existing infrastructure to improve electricity transmission capacity and reliability in the western region.
ACSR CONDUCTORS
The Butwal-Kohalpur 132 kV transmission line project aimed to enhance Nepal's power transmission network by establishing a 111 km-long high-voltage line, boosting electricity accessibility and reliability in the southwestern region.
ACSR CONDUCTORS
The Chameliya Hydroelectric Project, completed in 2019, is a 30 MW run-of-river power plant in Nepal's Darchula district, contributing to the national grid and regional development.
ACSR CONDUCTORS
The Lower Modi Hydroelectric Project, a 10 MW run-of-river plant on the Modi Khola River in Parbat, Nepal, harnesses clean water flow to generate electricity for the national grid.
ACSR CONDUCTORS
Nepal's largest, the Upper Tamakoshi Hydroelectric Project is a 456 MW run-of-river plant, harnessing the Tamakoshi River for clean energy generation and national grid stability.
ACSR CONDUCTORS
Nepal's first 220 kV transmission line, the Khimti-Dhalkebar project, facilitated power evacuation from eastern hydro projects and improved electricity supply in the region.
ACSR CONDUCTORS
The 13 MW Sikles Hydroelectric Project, commissioned in 2017, utilizes the Madkyu River in Nepal to generate clean electricity, contributing to the national grid and powering the Kaski district.
ACSR CONDUCTORS
Completed in 2022, this 42.5 MW run-of-river plant contributes clean energy to the national grid. This 12.5 MW run-of-river plant utilizes tailwater from the upper project, maximizing power generation and resource efficiency.
ACSR CONDUCTORS
The Ridi Hydropower Project, a 2.4 MW run-of-river plant in Nepal, has utilized the Ridi River's flow to generate clean electricity since 2009, contributing to the national grid.
ACSR CONDUCTORS
The Kadoorie Agricultural Aid Association (KAAA), founded in 1951, empowers rural communities in Hong Kong and Nepal through agricultural training, infrastructure projects, and sustainable development initiatives.
ACSR CONDUCTORS
Inaugurated in 2023, the Lumbini Cable Car in Nepal offers scenic gondola rides between Butwal and Palpa, boosting tourism and regional development. It features stunning views and is developing into a recreational destination.
POWER CABLES
FRLS WIRES
The "Minister Quarter Bhaisepati" refers to a government project in Nepal constructing new residences for the country's ministers in Bhaisepati, Lalitpur. This project aims to provide modern and well-equipped housing for officials, potentially replacing the existing quarters in Pulchowk.
POWER CABLES
FRLS WIRES
The Citizen Investment Trust, established in 1991, is a public financial institution in Nepal. It mobilizes investments from the public and uses them to fund various development projects and promote economic growth.
POWER CABLES
FRLS WIRES
The AANSON Building in Kathmandu, established by the Airports and Air Navigation Services of Nepal (AANSON), houses the Aviation Training Institute, nurturing future aviation professionals and contributing to the growth of Nepal's aviation industry.
POWER CABLES
FRLS WIRES
Hotel Ryne in Sinamangal, Kathmandu, offers a luxurious 4-star haven for travelers. Equipped with modern amenities and blending Nepalese culture with Western comfort, it caters to a relaxing and culturally immersive experience.
POWER CABLES
FRLS WIRES
Hilton Kathmandu: Modern luxury in Kathmandu's heart, with stunning Himalayan views and world-class service.
FRLS WIRES
Established in 2003, NAMS is a government agency responsible for medical education and research in Nepal. It oversees Bir Hospital and other affiliated medical institutions.
POWER CABLES
FRLS WIRES
The Yamaha assembly facility in Ramgram, Nepal, was completed by Morang Autoworks at a cost of Rs 1.5 billion. The Japanese automaker is utilizing government incentives, such as lower excise and customs taxes. Yamaha's decision to build bike assembly operations in the Nepali market is in line with similar moves made by TVS and Hero.
POWER CABLES
FRLS WIRES
The Butwal Exhibition Center, under construction and expected to be the largest in Nepal, aims to be a premier venue for trade shows, exhibitions, and events, boosting the economy and promoting regional development in Butwal.
POWER CABLES
FRLS WIRES
Gokul Apartment in Birgunj offers modern living spaces in a convenient location. it caters to individuals and families seeking a comfortable and contemporary lifestyle.
EcoWire-ZH